← Blog  ·  Site evaluation  ·  November 6, 2026  ·  2 min read

The accessible route: why ADA matters at a charging site

The accessible route: why ADA matters at a charging site

Charging is public, so it has to be usable by drivers with disabilities.

What we check

We look at the route from the chargers to where drivers need to go, along with safety and lighting, as part of the evaluation.

Why early

Better to find a problem on paper than halfway through a project.

Where it fits

It is part of check number four in our six checks: public access, safety, lighting, and the ADA route.

Is your lot a fit?

Send us the address. It is free, there is no obligation, and you get a plain yes or no with the reason.

Request a free site evaluation